Skip to main content

Stowe Lane Pump Station Project No. 1764.0

The Stowe Lane Pump Station Replacement Project includes removal of the existing pump station above grade structure and abandonment of place of existing below grade structure, construction of a new and more efficient wet well and valve pit layouts, re-routing of gravity lines to the wet well, new pumps and switchgear controls, incorporation of multi-smart panel, and replacement of the pump station generator set. Safety features addressed as part of the project include improved lighting, fall protection access hatches, 8-foot-high perimeter fencing, passive wet well ventilation, and provision for security cameras. The District Board on December 13, 2023 approved Call for Bids for the project with anticipated bid opening in February 2024.