Willow Road Pump Station Project No. 1765.0
The Willow Road Pump Station Wet Well Rehabilitation and Discharge Piping Replacement Project includes the recoating of the pump station wet well and valve pit to extend the operational life of the existing structure, replacement of the discharge lines of each pump through the valve pit, and replacement of the pump station generator set. Safety features addressed as part of the project include improved lighting, fall protection access hatches, passive wet well ventilation odor control, replacement of fencing with 8-foot-high perimeter fencing, and provisions for security cameras. The District Board on December 13, 2023 approved Call for Bids for the project with anticipated bid opening in February 2024.